Electricity distribution is the final stage in the delivery of electricity to end users. A distribution system's network carries electricity from the transmission system and delivers it to consumers. Typically, the network would include medium-voltage (less than 50 kV) power lines, substations and pole-mounted transformers, low-voltage (less than 1 kV) distribution wiring and sometimes meters.
The modern distribution system begins as the primary circuit leaves the sub-station and ends as the secondary service enters the customer's meter socket. Distribution circuits serve many customers. 
The voltage used is appropriate for the shorter distance and varies from 2300 to about 35,000 volts depending on utility standard practice, distance, and load to be served. Distribution circuits are fed from a transformer located in an electrical substation, where the voltage is reduced from the high values used for power transmission.

Conductors for distribution may be carried on overhead pole lines, or in densely-populated areas where they are buried underground. Urban and suburban distribution is done with three-phase systems to serve both residential, commercial, and industrial loads. Distribution in rural areas may be only single-phase if it is not economic to install three-phase power for relatively few and small customers.

Only large consumers are fed directly from distribution voltages; most utility customers are connected to a transformer, which reduces the distribution voltage to the relatively low voltage used by lighting and interior wiring systems. The transformer may be pole-mounted or set on the ground in a protective enclosure. In rural areas a pole-mount transformer may serve only one customer, but in more built-up areas multiple customers may be connected. In very dense city areas, a secondary network may be formed with many transformers feeding into a common bus at the utilization voltage. Each customer has an "electrical service" or "service drop" connection and a meter for billing. (Some very small loads, such as yard lights, may be too small to meter and so are charged only a monthly rate.)

A ground connection to local earth is normally provided for the customer's system as well as for the equipment owned by the utility. The purpose of connecting the customer's system to ground is to limit the voltage that may develop if high voltage conductors fall on the lower-voltage conductors, or if a failure occurs within a distribution transformer. If all conductive objects are bonded to the same earth grounding system, the risk of electric shock is minimized. 
However, multiple connections between the utility ground and customer ground can lead to stray voltage problems; customer piping, swimming pools or other equipment may develop objectionable voltages. These problems may be difficult to resolve since they often originate from places other than the customer's premises.

International differences

In many areas, "delta" three phase service is common. Delta service has no distributed neutral wire and is therefore less expensive. The neutral provides a low-resistance metallic return to the distribution transformer. Wye service is recognizable when a line has four conductors, one of which is lightly insulated.

Many areas in the world use single-phase 220 V or 230 V residential and light industrial service. In this system, the high voltage distribution network supplies a few substations per area, and the 230V power from each substation is directly distributed. A hot wire and neutral are connected to the building from one phase of three phase service. Single-phase distribution is used where motor loads are small.

Split Phase

Split phase provides both 120 V and 240 V service with only three wires. The house voltages are provided by local transformers. The neutral is directly connected to the three-phase neutral. Socket voltages are only 120 V, but 240 V is available for heavy appliances because the two halves of a phase oppose each other.

Japan has a large number of small industrial manufacturers, and therefore supplies standard low-voltage three phase-service in many suburbs. Also, Japan normally supplies residential service as two phases of a three phase service, with a neutral. These work well for both lighting and motors.

Rural services normally try to minimize the number of poles and wires. Single-wire earth return (SWER) is the least expensive, with one wire. It uses high voltages, which in turn permit use of galvanized steel wire. The strong steel wire permits inexpensive wide pole spacings. Other areas use high voltage split-phase or three phase service at higher cost.

Electricity meters use different metering equations depending on the form of electrical service. Since the math differs from service to service, the number of conductors and sensors in the meters also vary.
Besides referring to the physical wiring, the term electrical service also refers in an abstract sense to the provision of electricity to a building.

In the early days of electricity distribution, direct current (DC) generators were connected to loads at the same voltage. The generation, transmission and loads had to be of the same voltage because there was no way of changing DC voltage levels, other than inefficient motor-generator sets. Low DC voltages were used (on the order of 100 volts) since that was a practical voltage for incandescent lamps, which were the primary electrical load. Low voltage also required less insulation for safe distribution within buildings.

The losses in a cable are proportional to the square of the current, the length of the cable, and the resistivity of the material, and are inversely proportional to cross-sectional area. Early transmission networks used copper, which is one of the best economically feasible conductors for this application. To reduce the current and copper required for a given quantity of power transmitted would require a higher transmission voltage, but no efficient method existed to change the voltage of DC power circuits. To keep losses to an economically practical level the Edison DC system needed thick cables and local generators. Early DC generating plants needed to be within about 1.5 miles (2.4 km) of the farthest customer to avoid excessively large and expensive conductors.